The dewatering and mineralization of sludge in the constructed reed bed was investigated in this study.The sludge from the secondary sedimentation tank is from in the wastewater treatment plant in Yiyang city,Hunan province.Anaerobic pond and oxidation ditch biological treatment processes is accepted there.The performance of the system was monitored for one year. Total Solids (TS), Volatile Solids(VS), Chemical Oxygen Demand, nutrients (TKN) and Total Phosphorus(TP), heavy metals in the sludge were analysed.The removal rate of COD,NH4-N,and TP of the percolated fluid for the first cycle was al...