版权说明 操作指南
首页 > 成果 > 详情

High-precision imaging of small voids in tunnel lining based on reverse time migration

认领
导出
Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文
作者:
Ling, Tonghua;Jiang, Hao;Zhang, Liang;Zhang, Sheng;Bei, Zhenghao;...
通讯作者:
Jiang, H
作者机构:
[Bei, Zhenghao; Ling, Tonghua; Long, Bin; Jiang, Hao] Changsha Univ Sci & Technol, Sch Civil Engn, Changsha 410114, Peoples R China.
[Zhang, Liang; Zhang, Sheng] Hunan City Univ, Coll Civil Engn, Yiyang 413000, Peoples R China.
[Jiang, Hao] Changsha Univ Sci & Technol, 960,2nd Sect,Wanjiali RD S, Changsha 410004, Hunan, Peoples R China.
通讯机构:
[Jiang, H ] C
Changsha Univ Sci & Technol, 960,2nd Sect,Wanjiali RD S, Changsha 410004, Hunan, Peoples R China.
语种:
英文
关键词:
lining void;ground penetrating radar;reverse time migration;digital morphology;edge detection
期刊:
JOURNAL OF GEOPHYSICS AND ENGINEERING
ISSN:
1742-2132
年:
2024
卷:
21
期:
4
页码:
1071-1084
基金类别:
National Natural Science Foundation of China [52308399, 52078061]; National Natural Science Foundation of China [22A0562, 23C0664]; Scientific Research Project of the Department of Education of Hunan Province [202319]; Technological Progress and Innovation Project of the Department of Transportation of Hunan Province
机构署名:
本校为其他机构
院系归属:
土木工程学院
摘要:
Diseases such as voids behind the initial support of the tunnel will lead to problems such as lining rupture and concrete damage in the tunnel structure, which seriously affects the driving safety in the tunnel. In tunnel construction, ground penetrating radar is frequently employed as a method for detecting hidden defects. However, when the cavity size is small, there will be a large error when the original radar data is directly interpreted, which cannot meet the needs of practical engineering. To enhance the precision in tunnel detection, the Finite-Difference Time-Domain method is used to ...

反馈

验证码:
看不清楚,换一个
确定
取消

成果认领

标题:
用户 作者 通讯作者
请选择
请选择
确定
取消

提示

该栏目需要登录且有访问权限才可以访问

如果您有访问权限,请直接 登录访问

如果您没有访问权限,请联系管理员申请开通

管理员联系邮箱:yun@hnwdkj.com