During the construction process of the Pipe-roof Pre-construction Method (PPM), the main excavation is executed under the protection of a previously created and reliable structure, which ensures safety in construction. Moreover, PPM does not affect the road traffic, generally does not require the moving of underground pipelines, and does not cause excessive surface settlement. The Xinleyizhi Station of the Shenyang subway system is a single arch long-span structure in poor geological conditions and with a complex surrounding environment and strict requirements for construction period. After co...