Analysis of the ground deformation to large crosssection tunnel by Pipe-roof Pre-construction Method

认领
导出
Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文
作者:
Li, Y.*;Zhang, K.;Huang, C.;Li, Z.;Deng, M.
通讯作者:
Li, Y.
作者机构:
School of Geoscience and Info-Physics, Central South University, Changsha, Hunan, 410083, China
School of Civil Engineering, Hunan City University, China
China Construction Municipal Construction Corporation Limited, China
通讯机构:
School of Geoscience and Info-Physics, Central South University, China
语种:
英文
关键词:
Ground Deformation;Monitor;New Tubular Roof Method;Numerical Simulation;Pipe-roof;Pre-construction Method;Subway
年:
2011
页码:
2889-2892
机构署名:
本校为其他机构
院系归属:
土木工程学院
摘要:
Urban underground engineering construction may have bad influence on the environment and even cause disasters. Pipe-roof Pre-construction Method(PPM) had been used in building a metro station of line No.2 of Shenyang subway. It's very important to analyze and evaluate the deformation of the environment in order to ensure the safety of constructing procedure. So, based on the detailed study of geological conditions and PPM, Flac3D software combined with field monitoring data in stations earthwork phase is used. And then, research on the surface ...