MBBR+two-stage AO in upgrading and rebuilding project of a sewage treatment plant in north China

认领
导出
Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文、会议论文
作者:
Shen Dongmei;Yu Cairui;Gao Yulan;Song Xinwei;Chu Jingsong
通讯作者:
Yu, C.
作者机构:
[Gao Yulan; Shen Dongmei; Yu Cairui; Song Xinwei] West Anhui University, Architecture and Civil Engineering Department, Lu'an, 237012, China
[Chu Jingsong] Planning and Architectural Design Research Institute, Hunan City University, Beijing Haidian Branch, Beijing, 100089, China
通讯机构:
[Yu, C.] W
West Anhui University, China
语种:
英文
关键词:
conference;proceedings;environment;energy;earth sciences
期刊:
E3S Web of Conferences
ISSN:
2267-1242
年:
2019
卷:
136
会议名称:
2019 International Conference on Building Energy Conservation, Thermal Safety and Environmental Pollution Control, ICBTE 2019
会议时间:
1 November 2019 through 3 November 2019
主编:
Fang T.Khaletski V.
出版者:
EDP Sciences
基金类别:
This research was supported by the grants from Natural science research project of West Anhui University (WXZR201628)
机构署名:
本校为其他机构
摘要:
A sewage treatment plant is located in the middle of Inner Mongolia. There is a large amount of slaughtering wastewater in the influent with high COD, SS, low annual temperature, poor nitrogen removal effect, and the effluent quality is only grade B. In order to solve the above problems, A\A\O-MBBR + high efficiency sedimentation tank continuous sand filter process was adopted to establish a new anaerobic tank and a first stage AO-MBBR bioreactor. The selection tank and partial oxidation ditch were transformed into the second stage A pool (anox...