Based on the existing foundation reinforcement project of Henan Polytechnic University boiler house, the construction steps of the existing cast-in-place pile foundation reinforced by the micro steel pipe pile group were optimized, and the foundation and column were simplified as a beam model fixed at one end and simply supported at the other, then its accuracy was verified. The field test on the deformation characteristics of the existing foundation reinforced by the micro steel pipe pile was carried out. The surface displacement between the existing column and two columns and the change law ...